-40%
TESLA Model 3 and Model Y Stabilizer Link Front Right replaces 1044396 00 D
$ 11.88
- Description
- Size Guide
Description
TESLA MODEL 3, MODEL Y Stabilizer Link (Sway Bar) for- Tesla Model 3's manufactured on 01.2017 and newer
- Tesla Model Y's manufactured on 03.2019 and newer
Will replace OEM part no 104439600D,
1044396-00-D,
1044396 00 D
.
Will fit Front Right.
Brand New Part.
Reverse engineered and manufactured to be exact same fit and to perform same as original OEM part.
Strong durable design with Electrostatic Plating, Clamping Rings and Poly Dust Covers for long life.
Pre-Greased Closed Housing design for no-maintenance continuous operation. Will require no greasing, ever.
We will ship 1 part in a clear plastic bag. The part will have the necessary Class 8 quality Nylock Nut(s).
Will ship from Florida, USA.
There is no box or installation manual.
Quurex Part No TS-L103.
This part has been manufactured for us (QUUREX) in a European Chassis Parts manufacturer, Disa Automotive.
-
Disa Automotive Manufacturing factory has IATF 16949, ISO 9001 and ISO 14001 quality certificates and
following Functional Tests have been done on the product you are about to purchase;
Fatigue (Key Life) and Leakage test
Vibration test
Axial and Radial Spring Travel test
Initial Breakaway and Rotating Torque test
Welding Tensile Strength Test
Ball Pin Breakaway test
Ball Pin Pull Out and Push out test
Material Spectrometer checks
Material Microstructure Analysis
Salt Spray test
Technical Part Cleanliness test
These tests ensure the product has very high quality and a long life.
More over;
-
at Disa Automotive manufacturing factory, a
ll production, maintenance, planning, purchasing, quality, product development human resources and project departments are compliant with VDA 6.3 process audit requirements.
-
Disa Automotive has the following procedures intact in its quality management system:
Statistical Process Control (SPC) studies (Cpk, Ppk, Cmk), Live SPC production control, Incoming goods control, Serial production process controls, Final controls, Measurement System Analysis (MSA), Design and Process FMEA studies, Effective 8D approach, Problem solving methodologies, Continuous improvement, Preventive and corrective actions, PPAP / PPA documentation according to customer requests.